Home Products About Us Factory Quality Projects News Contact Get a Quote
NEWS

From the workshop and the site.

Custom bridge moulds arrayed in the workshop before dispatch
2025

Puyan Expressway | 400+ Tonnes Steel Components

Over 400 tonnes of steel components — tie beams, pier columns and capping beams — supplied to China Railway No.10 for Puyan Expressway Section 3.

Read case study
CNC press brake forming formwork panels in the workshop
2025

Pingzan Expressway T-Beam Moulds | Custom Supply

Custom steel moulds for T-beams and substructure components, supplied to China Communications No.2 Engineering Bureau for Pingzan Expressway Branch 8.

Read case study
Large custom mould under the workshop overhead crane
2025

Huanghua Port Expressway Formwork | Whole-Bid Supply

One-stop whole-bid formwork supply — T-beam, capping beam and pier column components — for China State Construction Road & Bridge Corp.

Read case study
Workshop interior where the formwork set was trial-assembled
2025

Daxing Airport Project Formwork | Custom Moulds

Customized pier column and capping beam formwork supplied to Beijing Municipal Engineering Group for the Daxing Airport supporting project.

Read case study
Steel Formwork vs Plywood Moulds: A Real Cost Comparison for 2026 Projects
2026

Steel Formwork vs Plywood Moulds: A Real Cost Comparison for 2026 Projects

Steel formwork costs 3-5x more upfront but repays in 8-15 casts. Full cost breakdown with rebar, labour, cycle time and waste numbers from actual projects.

Read case study
Box Culvert Steel Formwork: How to Specify It and What Customisation Actually Costs
2026

Box Culvert Steel Formwork: How to Specify It and What Customisation Actually Costs

How to specify box culvert steel moulds: dimensional tolerances, core and shell design, pour rate limits, stripping sequence. Plus what drives custom fabrication cost.

Read case study
Column and Cylindrical Formwork: Choosing Between Clamp Systems and Half-Shell Moulds
2026

Column and Cylindrical Formwork: Choosing Between Clamp Systems and Half-Shell Moulds

When to use steel clamp hoops vs half-shell column moulds. Diameter ranges, pour pressure limits, bolt spacing, stripping time and cost per metre of column height.

Read case study
Steel Formwork Inspection and First Cast: A Practical Checklist
2026

Steel Formwork Inspection and First Cast: A Practical Checklist

What to check when a steel mould arrives and how to run the first cast: dimensional verification, weld inspection, trial assembly, pour rate, and what to record.

Read case study
Buying Steel Formwork from Overseas: FOB Terms, Inspection and Shipping Explained
2026

Buying Steel Formwork from Overseas: FOB Terms, Inspection and Shipping Explained

Practical guide to importing steel formwork: what FOB Tianjin covers, pre-shipment inspection scope, container loading plans, packing for salt water, and customs documents.

Read case study
Precast Concrete steel formwork in the workshop
2026

Steel Formwork for Precast Concrete: Selection Criteria for Contractors

Workshop guide to steel formwork for precast concrete: panel thickness, welding, tolerances, reuse, and cost per pour. For contractors and precast plants.

Read case study
Precast Concrete steel formwork in the workshop
2026

Steel Formwork for Precast Concrete: A Buyer's Selection Guide

Buyer's guide to steel formwork for precast concrete. Compare panel thickness, rib design, pour rates, and reuse cycles. Get workshop-side selection criteria and cost arithmetic.

Read case study
Precast Concrete steel formwork in the workshop
2026

Steel Formwork Diagram: How to Read It Before You Buy

Learn to read steel formwork diagrams: panel thickness, rib spacing, stripping sequence, and pour rate limits. Avoid costly rework. For precast plants.

Read case study
Precast Concrete steel formwork in the workshop
2026

Steel Formwork Diagram: How to Read and Choose Precast Moulds

Learn to read steel formwork diagrams for precast moulds: panel thickness, rib spacing, stripping sequence, and cost trade-offs. Avoid costly mould mistakes.

Read case study
Lego-Style Interlocking Block Formwork in the workshop
2026

Lego-Style Interlocking Block Formwork: How to Choose

How to choose Lego-style interlocking block formwork for retaining walls. Compare steel grades, panel thickness, stripping methods, and cost per block. Expert guide.

Read case study
Lego-Style Interlocking Block Formwork in the workshop
2026

Lego-Style Interlocking Block Formwork: 7 Selection Criteria

How to choose Lego-style interlocking block formwork for retaining walls. Compare 3-6 mm panels, rib designs, reuse cycles, lead times, and costs.

Read case study
Lego-Style Interlocking Block Formwork in the workshop
2026

What Drives the Cost of Lego-Style Interlocking Block Formwork

Understand the real cost structure of Lego-style interlocking block moulds: steel, welding, tolerance, order size, and freight. Make informed buying decisions.

Read case study
Lego-Style Interlocking Block Formwork in the workshop
2026

What Drives the Cost of Lego-Style Interlocking Block Formwork

Detailed cost structure of Lego-style interlocking block formwork: steel thickness, welding, tolerance, order size, and freight. Make informed buying decisions.

Read case study
Precast Concrete steel formwork in the workshop
2026

Steel Formwork Price: 7 Criteria for Precast Buyers

Steel formwork price depends on panel thickness, rib design, tolerance, and welding. Compare 3-6 mm panels, 60-100 reuses, and lead times to choose wisely.

Read case study

News worth quoting — so quote us.

Project deliveries and product updates. Subscribe by email: sales@zhongbianmfg.com.

Contact Us