Home Products About Us Factory Quality Projects News Contact Get a Quote
CUSTOM STEEL MOULD & FORMWORK · HEBEI, CHINA

Custom Concrete Steel Mould & Formwork Manufacturer.

Professional steel moulds for infrastructure — block, channel, culvert, wall and bridge. Durable, cost-effective mould solutions for global projects, built to your drawings.

25 Years Experience10+ Awards±0.5 mm
25Years of experience
10+Industry awards
400+ tSupplied to Puyan Expwy Section 3
±0.5 mmDimensional tolerance
WHAT WE BUILD

Three directions,
one build standard.

Every mould is custom concrete steel formwork — Q235B panels, fully welded ribs, ±0.5 mm.

Bridge Steel Formwork

Custom bridge pier, box girder & abutment formwork, high-precision splicing, reusable for highway & bridge engineering.

Infrastructure Moulds

Box culvert, U/L channel, pipe jacking & retaining wall steel moulds, fully customizable for municipal construction.

Custom Shaped Moulds

Tetrapod, bionic block and lego-style interlocking block moulds — complex organic geometry cast accurately to customer drawings.

ABOUT US

A custom mould factory that thinks in drawings.

Hebei Zhongbian Machinery Manufacturing Co., Ltd. is a custom concrete steel mould & formwork manufacturer in Xushui District, Baoding City, Hebei — 25 years of experience, 10+ industry awards.

We build to customer drawings: Q235B hot-rolled panels 3–5 mm, channel/flat back ribs fully welded, dimensional tolerance ±0.5 mm. Standard moulds ship in 7–10 working days; exports move via FOB Tianjin with waterproof film and wooden crating.

Read more
Workshop interior with overhead crane and custom mould assemblies
SELECTED PROJECTS

Supplied to the big four.

Expressway and airport-corridor programmes with national-level contractors.

Custom T-Beam & Substructure Moulds - precast concrete formwork project
ExpresswayPingzan Expressway Branch 8

Custom T-Beam & Substructure Moulds

Custom steel moulds supplied exclusively for T-beams and substructure components.

Client — China Communications No.2 Engineering Bureau
Read case study
One-Stop Whole-Bid Formwork Supply - precast concrete formwork project
Expressway · HighwayHuanghua Port Expwy Branch 1 · Hanxing Line 107

One-Stop Whole-Bid Formwork Supply

T-beam, capping beam and pier column supporting components under a one-stop whole-bid contract.

Client — China State Construction Road & Bridge Corp.
Read case study
Pier Column & Capping Beam Formwork - precast concrete formwork project
Aviation HubDaxing Airport Supporting Project

Pier Column & Capping Beam Formwork

High-standard customized formwork for pier columns and capping beams.

Client — Beijing Municipal Engineering Group
Read case study
All projects
LATEST NEWS

From the workshop
and the site.

Project deliveries and company updates.

Precast Concrete steel formwork in the workshop
2026

Steel Formwork Price: 7 Criteria for Precast Buyers

Steel formwork price depends on panel thickness, rib design, tolerance, and welding. Compare 3-6 mm panels, 60-100 reuses, and lead times to choose wisely.

Read case study
Lego-Style Interlocking Block Formwork in the workshop
2026

What Drives the Cost of Lego-Style Interlocking Block Formwork

Detailed cost structure of Lego-style interlocking block formwork: steel thickness, welding, tolerance, order size, and freight. Make informed buying decisions.

Read case study
Lego-Style Interlocking Block Formwork in the workshop
2026

What Drives the Cost of Lego-Style Interlocking Block Formwork

Understand the real cost structure of Lego-style interlocking block moulds: steel, welding, tolerance, order size, and freight. Make informed buying decisions.

Read case study
All news

Send a drawing — we reply within 24 hours.

Standard moulds in 7–10 working days. FOB Tianjin, export documents included, 12-month factory warranty.

Contact Us

Frequently asked questions

What steel do you use, and how many reuses can I get?
Q235B national-standard hot-rolled steel plate with 3–5 mm panels; back ribs in channel/flat steel, fully welded. Standard flat moulds run 60–100 reuses; heavy bridge moulds 120+.
How long does a custom mould take?
Standard moulds: 7–10 working days. Large bridge moulds and shaped blocks (e.g. tetrapods): 15–25 days.
How do you ship internationally?
FOB Tianjin as standard; CIF delivery available (e.g. Bangkok, Durban). Every set is wrapped in waterproof film and fixed in wooden crates to prevent sea-freight rust.
Which export documents do you provide?
Commercial Invoice, Packing List, Mill Certificate (MTC), Certificate of Origin (CO), FORM E.
What about warranty and after-sales?
12-month factory warranty — free replacement for non-man-made weld cracks or panel deformation. Free English installation manual and video; engineers can be sent on site for large orders; bolts and seals kept in stock.